Photo library image Deepwell wellhead J1035 CTRL 320 Thames Tunnel: Cut down dewatering well head in TBM launch chamber all, deepwell systems, discharge arrangements, railways, tunnels
Photo library image Deepwell dewatering for TBM launch chnamber J1035 CTRL 320 Thames Tunnel: Cut down dewatering well head in TBM launch chamber all, deepwell systems, railways, tunnels
Photo library image Internal dewatering wells for cut and cover tunnel approach J1035 CTRL 320 Thames Tunnel: Wells installed within approach structure to allow dewatering to continue until roof and backfill complete all, deepwell systems, railways, top down construction, tunnels
Photo library image Dewatering wells for braced excavation J1035 CTRL 320 Thames Tunnel: Internal deepwells for cut and cover approach all, deepwell systems, excavations, tunnels
Photo library image Dewatering for TBM launch chamber J1035 CTRL 320 Thames Tunnel: Deepwell dewatering for TBM launch chamber all, deepwell systems, railways, tunnels
Photo library image Internal deepwells for railway approach J1035 CTRL Thames Tunnel: Cut and cover tunnel with sheetpile side support and substantial propping all, deepwell systems, railways, tunnels
Photo library image Permament dwatering scheme using horizontal wells J1244: Permanant drainage scheme for railway tunnel suffering groundwater and sand ingress all, permanent drainage, shafts, tunnels
Photo library image The Conwy Crossing North Wales under construction Main ejector pumping ststaion for the excavation for the western approach structure all, ejector systems, excavations, roads, tunnels
Photo library image In-tunnel wellpoint Completed sub-horizontal in-tunnel wellpoint in Thanet Sand all, tunnels, wellpoint systems
Photo library image CTRL Thames Tunnel northern approach Reception chamber and cut and cover tunnel; note discharge buffer pond all, discharge arrangements, railways, recharge systems, tunnels