Fairlight Cove
Fairlight Cove
Coastal protection scheme
Hastings, United Kingdom
////

Drilling of wells

System section

Site plan
-
Clients
- Rother District Council
-
Main contractors
- Dean and Dyball
-
Consultants
- Terry Oakes Associates and GCG
-
Key contributors
- Halcrow Group
-
WJGL roles
- Pneumatic well system subcontractor
-
Project reference
- J1278
////
A number of measures were used to arrest cliff recession, which was threatening residential property, including a permanent groundwater control scheme which was installed by WJ. The scheme comprises an array of 56 wells installed at 5 m centres along a road above the back scarp of the slip. The wells are 25 m deep and are pumped using an electro-pneumatic system driven from a purpose built compressor house. The well heads are in manholes with connecting ducts for the pneumatic control system and monitoring sensor cables. The compressor house also contains a datalogger and modem which uses flow meters and vibrating wire transducers to monitor the system performance. WJ was responsible for the control and maintenance of the scheme for the first 5 years of operation.
////