Fairlight Cove

Fairlight Cove

Coastal protection scheme

Hastings, United Kingdom

////

Drilling photo

Drilling of wells

Javascript is required to view this map.
Section diagram

System section

Plan diagram

Site plan

  • Clients
    • Rother District Council
  • Main contractors
    • Dean and Dyball
  • Consultants
    • Terry Oakes Associates and GCG
  • Key contributors
    • Halcrow Group
  • WJGL roles
    • Pneumatic well system subcontractor
  • Project reference
    • J1278

////

A number of measures were used to arrest cliff recession, which was threatening residential property, including a permanent groundwater control scheme which was installed by WJ. The scheme comprises an array of 56 wells installed at 5 m centres along a road above the back scarp of the slip. The wells are 25 m deep and are pumped using an electro-pneumatic system driven from a purpose built compressor house. The well heads are in manholes with connecting ducts for the pneumatic control system and monitoring sensor cables. The compressor house also contains a datalogger and modem which uses flow meters and vibrating wire transducers to monitor the system performance. WJ was responsible for the control and maintenance of the scheme for the first 5 years of operation.

////