Rugeley Eastern Bypass

Rugeley Eastern Bypass

Stage 2, contract 2, Lea Hall Way extension

Rugeley, United Kingdom

////

Javascript is required to view this map.

  • Main contractors
    • Birse Rail
  • WJGL roles
    • Dewatering contractor
  • Project reference
    • J1297

////

The proposed by-pass works involved the construction of a concrete U-shaped trough and a series of bridge abutments which were slid into position under an existing railway embankment. These works required excavation over an area of 315 m by 40 to 50 m to a depth of 6 m. Ground conditions comprised Alluvium and Floodplain Gravels overlying Sandstone with standing groundwater level within 3m of ground level. WJ carried out a pumping test and used the results to develop a well dewatering scheme comprising eighteen 18 m deep wells. Discharge flows peaked at 180 l/s and the system was maintained in operation for 18 months. WJ used an automated data logger monitoring system, which provided a call-out alarm and near real time access to flow and drawdown data via WJ’s monitoring web site.

////

Find projects by keyword