Monitoring publications
Influence of large-scale inhomogeneities on a construction dewatering system in chalk
A Bevan, W Powrie and T O L Roberts
Available: www.icevirtuallibrary.com/content/article/10.1680/geot.9.P.010
Design and operation of a large dewatering system in Dubai
C P Botha, T O L Roberts and A Welch, 2009
17th International Conference on Soil Mechanics and Geotechnical Engineering, Alexandria, Egypt, 5–9 October
Construction of a deep shaft for Crossrail
G Holmes, A M McNamara, P R J Morrison, and T O L Roberts, 2008
Proc. Insts. Civ. Engrs. Geotechnical Engineering, 161, Issue GE6, December, pp299–309
Construction monitoring of cut and cover tunnels
A Chodorowski, G Holmes, and H Roscoe, 2005
Proceedings of the Institution of Civil Engineers. Geotechnical Engineering, 158, Issue GE4, October, pp187–196.
Measurement and analysis of temporary prop loads at Canary Wharf underground station, East London
M Batten and W Powrie, 2000
Proceedings of the Institution of Civil Engineers (Geotechnical Engineering), 143, July, pp151–163.
Comparison of measured and calculated temporary prop loads at Canada Water station
M Batten and W Powrie, 2000
Geotechnique 50(2), pp127–140.
Measurement of temporary prop loads at Mayfair car park
D R Beadman, G Holmes, D J Richards, 1999
Proceedings of the Institution of Civil Engineers, Geotechnical Engineering.
Use of vibrating wire strain gauges to measure loads in tubular steel props supporting deep retaining walls
M Batten, R Boorman, Q Leiper, W Powrie and H-t Yu, 1999
Proceedings of the Institution of Civil Engineers (Geotechnial Engineering) 137, January, pp3–13.
Measurement of prop loads in a large braced excavation during construction of the Jubilee Line Extension station at Canada Water, East London
M Batten, R Boorman, W Powrie and H T Yu, 1996
In: Geotechnical Aspects of Construction in Soft Ground. R J Mair and R N Taylor, Eds., Rotterdam, Balkema, pp57–62.