• Canary Wharf phase 2

  • Isle of Dogs, London, UK
  •  

////

canary wharf photo

Canary Wharf at night

sectional diagram

Dewatering to improve piling programme/capacity

data plot

Canary Wharf lower aquifer

Client
Canary Wharf Group
Main contractor
Canary Wharf Contractors
Consultant
Arup
Dewatering contractor
WJ Groundwater Ltd

////

Canary Wharf is built on the site of the West India Docks, until 1980 one of the busiest docks in the world. When the plan to build phase 2 of the development began, it was one of the largest building projects in Europe with more than 15 major buildings up to 45 storeys high in an area 400 m by 400 m. WJ installed a deepwell scheme comprising 15 wells 70 m deep designed to lower the groundwater by up to 25 m so that the piles for the development could be installed into dry ground. This speeded up installation and gave an increased pile load capacity resulting in a reduced piling programme and cost savings which more than covered the cost of the dewatering. A telemetry system was also installed by WJ to monitor groundwater levels and discharge flows and to provide an alarm warning in the event of system stoppage.

////

Key words

  • property development, chalk, deepwells